Here we begin the process of completly removing the old bathroom components right down to the bare concrete walls. All new framing, insulation, water lines and electrical was included in this job.
This is another shot of part of the exisiting wall structure.
This room was also completly remodeled while we were doing the bathroom.
This is a glass block window which was specially constructed to fit a window hole which had been previously covered up.
This is a shot of the new shower install. A 3 piece remodelers shower was used in this case. Also we had to
remove some of the concrete floor and repair the existing sewer line underneath the shower prior to install.
This is a shot of the new vanity and sink that was installed.
This area was completly remodeled, including sheet rock,
plumbing, and even heating ducts.